The midland mainline from Wigston junction north all the way to Sheffield is currently marked with the below tags. Given the project has been cancelled with no signs of any further work anytime soon, should these tags be removed?
proposed:electrified=contact_line
proposed:frequency=50
proposed:voltage=25000