New Residential estates - construction completion

Working at an urban design consultancy means I’ve got a pretty good idea when construction of roads in the stages in our estates are completed, and so I could make such updates for the roads / construction areas as time permits.
Therefore, what is the best point do to this, please? eg. registration of titles for each stage, or something different (such as statement of compliance for the Plans of Subdivision)
Thanks, John

Thanks, John!

Best option is probably mark them as proposed when it is 100% definite that the estate is actually going ahead, then up that to construction when they start turning dirt!

If you are talking about going from construction to live. I think, when the construction is finished/are in use on the ground

See also: Tagging "under construction" as long as it is not open for public?

Kees, that’s what I had in mind as the definition.
What prompted me was looking at one of our estates on OSM, where I noted a stage where the roads / utilities were completed perhaps by the start of 2024 (based on Vexcel imagery), but it was still shown as ‘construction’ (although IIRC it may have had a note about ‘construction’ being outdated / similar).
Regards, John

In many places, OSM doesn’t have enough contributors to systematically notice changes and update them. So the fact that something is still marked as construction doesn’t necessarily mean anyone thinks they still have some kind of construction status - it is more likely that no actuve mapper has been aware of the changes.

1 Like