A couple of ways will be closed for works commencing 3 aug’26 ending 30 jun’27 - or earlier or later, as happens to be the case; would like to tag these ways on OSM;
The poster is a cyclist who notes things that can be added / need to be amended / are no longer so, the cyclist is not an avid computer user, spent more than enough years sitting at a desk, is now finally free to roam;
That cyclist thinks, having read various OSM wiki pages, that the answer will eventually look like:
access=conditional
conditional=yes @ up-to 2026 aug 03 ; from 2027 jul 01
In this instance it is not sufficient to be able to read the wiki, one needs to understand, starting with pages like osm>wiki>opening-hours and osm>wiki>start-date, then branching out: that much is easy-peasy high school stuff from the pre-digital era;
And in case you wondered: this cyclist is not at all interested in learning how to decode hundreds of lines in the wiki - my remaining lifespan is just too short.
All that is needed is/ are cut-and -paste line(s) to add, with the correct tags, likely along the lines as included above, to the ways concerned.
Having spent about an hour reading and following links think there are various ways to do this:
1/ access=no, and hope someone will remember to look in July 2027
2/ highway=construction with expected end date of the construction on 30 June 2027
3/ conditional access - two options:
3a/ access=no 2026-08-03 - 2027-07-01
3b/ access=yes @ till 2026 aug 02 ; from 2027 jul 01
Advantage of 1/ is that it will not show up on the map, thus design consultants who wish to copy/paste a section of the map can incorporate this w/o showing a condition which will only exist for 11 months
advantage of 2/ is that it will be patently obvious - even to casual users - that something is diferent, but it will need to be followed up on site, first to make sure the works have actually finished on 30 June, and to see whether the reconstructed levee with ways conforms to the previous layout
advantage of 3/ is that routers will only start to divert users from this cycleway/ footpath on 3 August, and again include the ways in planned tours from 1 July 2027 onwards, same follow up needed as with 2/, to ensure works actually completed and re-instated ways are where they were.
advantage of 3b/ over 3a/ is that, while some routers are possibly not sufficiently advanced to evaluate conditional access, at least from 1 July 2027 onwards, or ‘till the end of times’ (or till someone views those ways) users will not be needlessly diverted.
Questions:
1/ OSM wiki : start-date and opening-hours do not clarify how to format year month day : would it be 2027 aug 03 or 2027-08-03?
2/ how to separate the start and end dates: dash of semicolon: 2027-08-03-2027-07-01 seems confusing, thus : 2026 aug 03-2027 jul 01?
3/ feel the eventual answer will look like:
access=conditional
conditional=yes @ up-to 2026 aug 03 ; from 2027 jul 01
Looking forward, both to a reply to these questions, and to an improved wiki page with this usage case included - perhaps with its own sub-heading,