This topic is about the viability of mass deleting/changing tags on El Salvador’s FENADESAL railway line.
Rail Transport in the country was fully phased out in 2007, facing serious deterioration beforehand. Nowadays most railway tracks left have:
-
Been paved over
-
Been built over
-
Dwellings built around them, causing the old lines to be now considered informal roads.
Additionally, the current mapping geometry of said lines country-wide were made 13 years ago, with minimal modifications. This causes cluttering of the map as there is not much of a point having almost non-existent lines in the way (except from OHM).


